Featured Articles

TSMC: Volume production of 16nm FinFET in 2H 2015

TSMC: Volume production of 16nm FinFET in 2H 2015

TSMC has announced that it will begin volume production of 16nm FinFET products in the second half of 2015, in late…

More...
AMD misses earnings targets, announces layoffs

AMD misses earnings targets, announces layoffs

AMD has missed earnings targets and is planning a substantial job cuts. The company reported quarterly earnings yesterday and the street is…

More...
Did Google botch the Nexus 6 and Nexus 9?

Did Google botch the Nexus 6 and Nexus 9?

As expected, Google has finally released the eagerly awaited Nexus 6 phablet and its first 64-bit device, the Nexus 9 tablet.

More...
Gainward GTX 970 Phantom previewed

Gainward GTX 970 Phantom previewed

Nvidia has released two new graphics cards based on its latest Maxwell GPU architecture. The Geforce GTX 970 and Geforce GTX…

More...
EVGA GTX 970 SC ACX 2.0 reviewed

EVGA GTX 970 SC ACX 2.0 reviewed

Nvidia has released two new graphics cards based on its latest Maxwell GPU architecture. The Geforce GTX 970 and Geforce GTX…

More...
Frontpage Slideshow | Copyright © 2006-2010 orks, a business unit of Nuevvo Webware Ltd.
Tuesday, 26 February 2013 10:20

First Tegra 4i phones come in late 2013

Written by Fuad Abazovic



Design cycle of 18 months to blame

Nvidia has a working prototype of Phoenix, its first reference phone design based on its first LTE chip. The chip codenamed Grey is now known as Tegra 4i. Nvidia not only has a working chip, it also has phone prototypes that it was showing around at MWC.

The bad thing for end users is that Grey, Nvidia Tegra 4i phones are not going to hit the market before late 2013, probably sometime in Q4 2013 at the earliest. You can blame the slow phone design cycle that usually takes 18 month. Tegra 4i will probably live through a good part of 2014. By 2014 Nvidia is expected to have its first high end chip with LTE codename Logan that can easily end up with Tegra 5 branding.

It turns out that Nvidia will get Grey Tegra 4i phones faster to market than the usual 18 months, the usual time it takes to design and build a smartphone. Then again Tegra 4i phones are still more than six months away. Tegra 4i is a big step for Nvidia as having LTE integrated on the chip saves some battery power, saves the design cost, saves a space on the phone motherboard and it becomes mandatory for many phone manufacturers.

Nvidia is making a lot of noise at the Mobile World Congress, especially touting the good performance of Tegra 4 against the competition but again there is a bitter aftertaste that things could have been much better for Nvidia had this chip been ready in late Q4 2012, as it was originally planned.

With such a roadmap Nvidia is on a good track to grow its Tegra business in the future, and let’s hope that there won’t be any additional unexpected delays down the road.

blog comments powered by Disqus

 

Facebook activity

Latest Commented Articles

Recent Comments